Customization: | Available |
---|---|
Tolerance: | 0.2-0.5mm |
Surface Treatment: | Spray Paint |
Still deciding? Get samples of US$ 100/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material | Mild steel, Cold roll steel,Hot roll steel,Zinc plate,Stainless steel, Aluminum, iron,brass,Titanium,SECC, SGCC, SPCC, SPHC, Other metal |
Thickness | 0.8mm~ 16.0mm ,Depends on your products |
Specification | Customized According to your drawing |
Surface finish | Zinc plating, Electroplating , Nickel plating, Anodic oxidation, Chrome plating, Yellow zinc plated, Electroless nickel plating, Chemical conversion coating, Powder Coating, Liquid painting Galvanized,Brushed, Sand blasting, Passivation , Heat treatment Silkscreen Custom as your special requirement |
Manufacturing Service | Laser cutting / Shearing / Punching / Bending / Welding / Coating / Others |
Drawing File | 2D: DWG,DXF, PDF 3D: ASM,DRW,DWG,DXF,IGS,STEP,so on |
Our Advantage |
How to place your order :
1.Please send us your drawings( 2D&3D) or sample.
2.Our engineering team work on them and submit competitive quotation for you.
3.Confirm sample order and fabricate samples after you approve the quotation and submit them to you for your inspection.
4.Confirm production order after you approve samples.
5.Payment and shipping terms are negotiable.
Q1: How to have my components quoted ?
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D( .STEP or .IGES files) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2: What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40-45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3: Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4: How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air.
Q5: How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.